The initial draft CFMP will be developed during the winter and spring of 2006. The completed initial draft CFMP will be submitted to the President and Cabinet by June 30, 2006 and to the Board of Regents by August 30, 2006. Upon submission and acceptance of the initial draft CFMP by the President and BOR, the initial draft CFMP Development Project is finished. The next steps in CFMP development will be influenced by feedback analysis of the CC response.
The initial draft CFMP will be developed during the winter and spring of 2006. The completed initial draft CFMP will be submitted to the President and Cabinet by June 30, 2006 and to the Board of Regents by August 30, 2006. Upon submission and acceptance of the initial draft CFMP by the President and BOR, the initial draft CFMP Development Project is finished. The next steps in CFMP development will be influenced by feedback analysis of the CC response.
Implementation of CFMP content is partially dependent on CC response, and will lead to a period of consideration and evaluation, by possibly a revised or “final” CFMP, by decisions regarding the sequence for changes to the Campus, followed by development of Design Basis and Engineering Design, and construction.
It is recommended that the Facilities Advisory Committee of the Board of Regents be charged with the responsibility:
-
To help, along with a broad-based group, evaluate CC feedback impact on the initial draft CFMP, to participate in feasibility studies of elements in the CFMP and to recommend next steps in possible development of a revised or final CFMP,
-
To make changes and additions to the University Strategic Plan based on CFMP conclusions,
-
Monitor implementation of the CFMP,
-
Annually review the 2006 CFMP and solicit and list issues and suggestions for the next Update, and
-
Manage the next Update of the CFMP in 2011.
|
December 2005
January 2006
February 2006
March 2006
April 2006
May 2006
|